CONTRASTING TREATED AND UNTREATED testing editor
The post clean survey carried out by remote CCTV demonstrates the stage at which the cleaning system started in the pipe, working back to the excavation. The black (dirty) section of pipe will be cleaned from the next excavation, in this case 320 meters downstream.
 
* all our videos are hosted on YouTube.